Why the repairs contract is the place to start a whole home approach
I think procurement teams can get a whole home approach moving without waiting for a new repairs model to arrive. The contracts they already manage decide what an operative is asked to do on a visit, what gets measured afterwards and what the contractor is paid for, so that’s where I’d begin.
Awaab’s Law Phase 2 adds weight to that. Alongside damp and mould, housing associations and local authorities now have to act on seven new emergency hazard categories, and the timescales for investigating, reporting, talking to tenants and getting access are tighter. If a contract only asks an operative to deal with the one job on the order, a lot of what’s wrong in a home will go unreported.
How we ended up with contracts that look at parts
Most repairs contracts follow the same logic as asset management, which splits a home into pieces. Kitchens have their own lifespan and condition rating, separate from roofs and windows. Fire doors and gas boilers are regulated and reported on individually, and specialists from damp surveyors to heating engineers are appointed for their own skills and held to their own KPIs. Long term asset management strategies evolve around this approach, which is why it feels so natural to write contracts the same way.
Budgets are carved up the same way, across planned maintenance, decarbonisation, responsive repairs and building safety. Even within reactive work, an operative usually turns up with one task and one defined outcome. There’s good reason for that, because it keeps accountability easy to follow, but it also means a contractor can spend time in a resident’s home and leave without saying a word about anything else they noticed.
Why the pressure keeps building
Repairs backlogs are already a problem across the sector, and next year Awaab’s Law Phase 3 and the 2035 Decent Homes Standard will pile more on top. The Housing Ombudsman’s 2025 Repairing Trust report described the sector’s model for maintaining existing homes as ‘unsustainable’ and pointed to persistent shortcomings in repairs and maintenance. Repairs also remain the biggest single source of tenant complaints.
Cost is a big part of this. A government impact assessment of Phase 2 puts compliance costs at more than ยฃ213 million over the next ten years, and annual spend on repairs and maintenance rose 6% year on year to ยฃ9.7bn in 2025-2026. Put those together and it’s hard to see how an approach to responsive repairs that treats each visit as a separate job can keep up.
Why it makes sense on the ground too
With Phase 2, the pressure around timescales for investigation and reporting, tenant communication and access is only going to grow. Access is one of the pressure points, so when someone is already inside a home it makes sense to make the most of the visit. Along with the job on the order, they can look for wider issues across the property before those issues get worse.
That means upskilling in-house operatives or incentivising contractors, whatever their trade, to see each home as a whole. Someone fitting a window latch or installing double glazing would be trained to notice other hazards and report them, leaving specialists to deal with whatever they find.
What I’d put into a whole home contract
Contract variations are a useful way in, and I’d start with four things.
The first is a short spot check. Selected contractors could complete a five point check each time they go into a home, noting whether there are signs of damp, breached double glazing or poor ventilation and reporting the results against new contract KPIs. It adds very little to the operative’s visit, and it gives the landlord a steady stream of information it doesn’t get today. Because the results sit against KPIs, they can be reported and reviewed like anything else in the contract, rather than depending on someone remembering to mention what they saw.
Reward comes next. Margins are tight among building contractors, so it’s understandable that they’ll be reluctant to take on extra responsibility with nothing in return. Procurement teams need to strike a careful balance here, because paying contractors for finding more work would point the incentive in the wrong direction. What you want to recognise is the spotting and reporting itself. It helps to be open with contractors about this from the start, because people are far more likely to see the extra checks as part of the job when they understand what’s being asked and why.
Then there’s training. A plumber or plasterer isn’t likely to look for hazards outside their trade unless someone has explained why it matters, so training on the signs to look for across different hazards will be essential. It needs thought, and it could be delivered by the landlord or put on to the contractor.
Last, the findings need somewhere to go. A spot check is only worth doing if the information reaches someone who can act on it, and procurement teams are well placed to bring asset management, housing management and suppliers together around that.
Procurement sits between all of those groups. We see the contracts, the suppliers and the spend, and we’re often the people asked to change how a contract works, which puts us in a good position to get everyone into the same conversation.
Making use of every visit
Think about how many different contractors and maintenance staff will visit one home over 20 years to survey, install and repair. It will run into the hundreds, and every one of those visits is a chance to look beyond the job in hand.
Picking up several issues in a single visit makes repairs and maintenance more efficient, and it supports prevention too, because trades learn to recognise the early signs before they turn into reportable problems. Mould, inadequate heating and pest infestation are all easier, and cheaper, for specialists to treat at that stage.
There’s a cultural side to this as well. Housing providers can start to change mindsets by putting residents first and talking about homes as connected places rather than ‘units’ or ‘assets’.
What it does to the budget
If landlords go down this route, most of the work will become preventative rather than reactive, and funding will need to follow. Over the longer term that means moving money from responsive repairs into planned maintenance, so it’s worth talking to finance colleagues early, before a contract asks for behaviour the budget isn’t set up to pay for. Budgets are usually allocated against separate programmes, as we saw earlier, so any shift will need agreement across teams.
Questions to take to your next contract review
These are the ones I’d ask, both of contractors and of your own colleagues.
- What does an operative report today when they see something outside the job on the order?
- Which KPIs would show whether early signs of damp, poor ventilation or breached double glazing are being picked up?
- Would contractors need training, and who would provide it?
- Where would the findings go, and who would act on them?
- Does your budget structure let you respond to preventative work?
Where I’d start
None of this will happen quickly. It needs new incentives, new partnerships and a willingness to change habits that have been in place for decades. With regulatory expectations rising and repair volumes so high, though, staying as we are is getting harder to justify.
My suggestion is to pick one contract and one group of contractors. Agree a short list of checks, link them to a KPI and decide where the findings will go. Then talk to the operatives about what they’d need to feel confident reporting what they see. Starting small means you can find out what the checks pick up and what people make of them, and adjust before anything is rolled out more widely.
If every visit on your busiest repairs contract came with a five point check, what would you most want it to tell you about your homes?
Neil Butters is Operations Director at Procurement for Housing (PfH)
This article is based on an opinion piece by Neil Butters published in Social Housing in November 2026. Read the original article on Social Housing.
How PfH can help
Procurement consultancy. Our consultancy team can help you review your spend, shape a procurement strategy that reflects regional priorities and build social value into your contracts. Our team can also be the spare capacity you need to begin to drive real change at a regional level without impact existing workloads.
Quantum gives you a single view of your spend and contract data, so you can see where your money goes and where there’s scope to work with others in your region..
Frameworks and DPS. Our compliant frameworks and DPS give members quick routes to market with national and local suppliers, including SMEs, without the time and cost of running a full tender.

About Neil Butters
Neil Butters is a procurement and operations specialist with extensive experience spanning the public sector, NHS, and housing framework sectors.
Currently Director of Operations at Procurement for Housing, Neil leads the operational delivery that enables housing providers and public sector organisations across the UK to access effective, compliant procurement solutions. He stepped into this role having spent over eight years as Head of Procurement at PfH, a tenure in which he made a significant and lasting contribution to the organisation’s growth and the development of its procurement offer.
Earlier in his career, Neil held senior procurement roles within the NHS, serving as Strategic Procurement Manager at NHS Shared Business Services and as Senior Contracts and Project Manager at Great Western Hospitals NHS Foundation Trust. In those roles, he led end-to-end procurement projects across a wide range of disciplines, deputised for the Head of Procurement, and managed complex, high-value contracts including the outsourcing of an outpatient pharmacy dispensary and the implementation of a managed equipment service across multiple clinical specialties.
Neil’s background is notably broad. Before moving into public sector procurement, he managed a 1,000-acre estate and castle, where he held responsibility for a multi-million-pound refurbishment project and oversaw a significant annual budget, an experience that gave him a distinctive grounding in financial accountability, stakeholder management, and operational leadership at the highest levels.
With deep expertise in public sector contracting, project management, and change management, Neil brings a commercially sharp and energetic approach to driving procurement excellence across the housing sector.