Awaab’s Law solutions guide
How PfH solutions support the phase 1 and phase 2 hazards | England only
Phase 2 of Awaab’s Law comes into force on 30 November, and the contractors you’ll need should be in place before then
Phase 1 came into force in England on 27 October 2025, covering damp and mould and emergency hazards. From 30 November 2026, phase 2 brings a much wider set of hazards under statutory timescales, including fire and explosion, electrical hazards, excess cold and heat, falls, domestic hygiene and structural collapse. From 2027, phase 3 covers all remaining HHSRS hazards.
For most social landlords, the hard part isn’t understanding the legislation. It’s having the right contractors and procurement routes ready before a hazard is reported and the clock starts. That’s where a missed timescale becomes a legal, regulatory and reputational problem.
This guide maps our frameworks, DPS and consultancy services to the hazards each one covers, so you can see quickly where you’re already covered and where the gaps are.
Inside this free guide:
- Get compliant: keep phase 1 covered and put the right contractors in place for phase 2. The frameworks and DPS routes that keep your damp and mould work on track and give you specialist compliance contractors for fire and explosion, electrical, lift safety, falls and domestic hygiene hazards.
- Fix it fast: respond within statutory timescales when hazards are reported. The responsive repairs, disrepair, heating, materials and DPS routes that help you act quickly when a hazard comes in, mapped to the specific hazards each one covers.
- Plan ahead: investment programmes that address hazards at scale. The planned works, capital works, decarbonisation, adaptations, surveys and consultancy routes for tackling hazards through longer-term investment rather than reactive repairs alone.
- Prevent: use technology to detect hazards before the statutory clock starts. How sensor, monitoring and analytics solutions through our SHED frameworks can pick up issues like damp, poor air quality and electrical faults before a tenant reports them.
- Key dates you need to plan around: The three phases of Awaab’s Law, what each one covers, and when it applies in England.
Essential for operations, asset management and procurement professionals in English social housing
- Operations and responsive repairs managers who need fast, compliant contractor routes ready for phase 2
- Asset management leads planning investment programmes that tackle hazards at scale
- Procurement teams who want a clear map of the routes available without running a full procurement exercise for every requirement
With phase 2 only weeks away, now’s the time to check your contractor routes and confirm where you have gaps. Framework access is available from day one of membership, and your account manager can walk you through the fastest route.